{"id":576,"date":"2015-06-17T18:42:48","date_gmt":"2015-06-17T08:42:48","guid":{"rendered":"http:\/\/www.alchester.com.au\/?p=576"},"modified":"2026-04-10T14:08:21","modified_gmt":"2026-04-10T04:08:21","slug":"fastline-benefits-from-alchester-technical-and-project-costs-management","status":"publish","type":"post","link":"https:\/\/abswww.alchester.com.au\/?p=576","title":{"rendered":"Fastline benefits from Alchester Technical and Project Costs Management"},"content":{"rendered":"<p style=\"text-align: justify;\">During 2013 th<a href=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2123.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"  wp-image-584 alignleft\" src=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2123-300x180.jpg\" alt=\"IMAG2123\" width=\"238\" height=\"143\" srcset=\"https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2123-300x180.jpg 300w, https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2123-1024x613.jpg 1024w\" sizes=\"auto, (max-width: 238px) 100vw, 238px\" \/><\/a>ru 2015, <span style=\"color: #000000;\"><strong>Fastline Logistics<\/strong><\/span>, again,\u00a0 expanded its 35 year\u00a0 logistics warehousing distribution business, this time,\u00a0 to deploy a <span style=\"color: #000000;\"><strong>fully automated KNAPP Multi-channel OSR &#8220;picking&#8221;<\/strong> <\/span>system in a purpose built warehouse facility.<\/p>\n<p style=\"text-align: justify;\">The decision to undertake this as an internally controlled and managed solution\u00a0 was\u00a0 promoted and overseen by<strong><span style=\"color: #0000ff;\"> Alchester<\/span><\/strong> in the capacity of <strong>external consultant\/mentor<\/strong> and collaborative <span style=\"color: #0000ff;\"><strong>strategic technical adviser<\/strong><\/span> in respect to aspects of disaster recovery, multi-site support and systems engineering considerations.<\/p>\n<p style=\"text-align: justify;\">Another aspect of the exercise involved\u00a0<span style=\"color: #0000ff;\"> <strong>budgeting and cost tracking<\/strong><\/span> of the many suppliers and services required.\u00a0 During the initial design,\u00a0 prototyping and evaluation phases of the project,\u00a0 it became evident that a distributed processing methodology to safeguard and reduce downtime risks, was the direction to take.<\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong><a style=\"color: #000000;\" href=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2408.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-582 alignright\" src=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2408-300x180.jpg\" alt=\"IMAG2408\" width=\"266\" height=\"160\" srcset=\"https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2408-300x180.jpg 300w, https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/IMAG2408-1024x613.jpg 1024w\" sizes=\"auto, (max-width: 266px) 100vw, 266px\" \/><\/a><\/strong><\/span>That<em> &#8216;distributed approach&#8217;<\/em> direction was the brainchild of the long standing IT manager, <span style=\"color: #000000;\"><strong>David Buchanan<\/strong><\/span> of <span style=\"color: #000000;\"><strong>Fastline<\/strong><\/span>, and <span style=\"color: #000000;\"><strong>Alchester<\/strong><\/span> assisted\u00a0 by providing encouragement,\u00a0 and that all important<em> &#8220;devil&#8217;s advoca<\/em><em>t<\/em><em>e&#8221;\u00a0 s<\/em>tyled technical brainstorming.\u00a0 This ensured that ancillary <strong><span style=\"color: #0000ff;\">systems engineering, communications, networking and databa<\/span><\/strong><strong><span style=\"color: #0000ff;\">se integrity<\/span><\/strong> aspects were managed and understood by fellow members of the Team, improving their familiarity with similar technologies, as the project unfolded.\u00a0\u00a0\u00a0 Liaisons with, and the forming of solid supplier relationships for the more complex aspects of the system, were vital parts of the undertaking.\u00a0 Meantime, the critical, application specific aspects of the design, were defined and addressed by the internal IT Team.<\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong>The Enterprise level , high availability database requirements in this environment in conjunction with failsafe, offsite and offline backup,\u00a0 and disaster plan considerations,\u00a0 exploited utilisation of well established Open Source technologies, ideal for these requirements, an area of specific interest and expertise of Alchester.\u00a0<\/strong><\/span>\u00a0 The project entailed the selection of appropriate <strong><span style=\"color: #0000ff;\">Enterprise level Open Source Solutions<\/span><\/strong> to address the realtime needs of the many applications involved, including<span style=\"color: #0000ff;\"><strong> EDI,\u00a0 WMS<\/strong><\/span> and the related interfacing to client data traffic handling.<\/p>\n<p style=\"text-align: justify;\">With a good, dynamic team of multi-skilled personnel on staff, coupled with their many years of logistics and warehousing know-how,\u00a0 the agile development of the overall project met extraordinary\u00a0 project deadlines and performance expectations, which is a testimony to the Fastline IT Team&#8217;s abilities.\u00a0 Naturally, as a result of this cohesive group&#8217;s abilities to work together, at times, under significant deadline challenges, but meeting those challenges head on, and coming up with<em> &#8216;the goods&#8217;,\u00a0<\/em> Alchester stands proud to have been associated with their superb outcome.<\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\"><em><a href=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2014\/09\/PB150023_Gary.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"  wp-image-58 alignleft\" src=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2014\/09\/PB150023_Gary.jpg\" alt=\"Gary Pope. B.Bus (ACC), Director: Alchester Business Systems, Professional Partner for Reckon Accounts, and authors of buildMGR CRM + Workflow\" width=\"88\" height=\"82\" \/><\/a>&#8220;Encouraging a team approach, and being both open and mindful of any limitations, requiring drawing upon external consultants if needed, is in part, the key to a successful project outcome&#8221;<\/em> recalls,<\/span> <span style=\"color: #0000ff;\">Gary Pope, of Alchester.<\/span><\/strong><em><strong><span style=\"color: #0000ff;\">\u00a0<\/span> <span style=\"color: #000000;\">&#8220;It&#8217;s more than just the Technology constraints and challenges in these situations &#8211; it&#8217;s also about the people working together.&#8221;<\/span><\/strong><br \/>\n<\/em><\/p>\n<p style=\"text-align: justify;\">Alchester&#8217;s role shifted from mentoring the strategic analysis aspects, to providing system administration support services, developing the automated EOD processing aspects and backup\/recovery scripts for the Open Source components. In addition, Alchester assisted the highly skilled and professional IT team of the firm, taking on the challenge of selecting, benchmarking, trialling and installing the diverse range of vendor products required, amidst the building of a purpose built warehouse at the same time.<\/p>\n<p style=\"text-align: justify;\">As an adjunct to the technical requirement<a href=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/Screenshot-180615-100451.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"  wp-image-590 alignleft\" src=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/Screenshot-180615-100451-300x142.jpg\" alt=\"Screenshot - 180615 - 10:04:51\" width=\"300\" height=\"142\" srcset=\"https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/Screenshot-180615-100451-300x142.jpg 300w, https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/Screenshot-180615-100451.jpg 763w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>s, was the <span style=\"color: #0000ff;\"><strong>project costing<\/strong><\/span> that was needed,\u00a0 which involved the timely and concise reporting to the Owners and their external Accountants, for funding and budgeting considerations of this multi-million dollar project.<\/p>\n<p style=\"text-align: justify;\">After the initial 12 months of solid, faultless production operation, followed additional stages of successful application improvements to cater for the ever shifting business needs of the many clients.<\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong>The result:<\/strong>\u00a0<\/span> Fastline&#8217;s\u00a0 solution demonstrates efficiencies, and leading edge logistics capabilities, that will continue to carry the business forward as a leader in its field.<\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong>Congratulations go to the IT team of Fastline who continue to manage the growth of this system.<\/strong><\/span><\/p>\n<p><a href=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/KNAPP_large_1051993.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-609 size-full\" src=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/KNAPP_large_1051993.jpg\" alt=\"KNAPP_large_1051993\" width=\"1920\" height=\"400\" srcset=\"https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/KNAPP_large_1051993.jpg 1920w, https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/KNAPP_large_1051993-300x63.jpg 300w, https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/06\/KNAPP_large_1051993-1024x213.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Seeing the full system in operation in this short overview below,\u00a0 showcasing the extent of Fastline&#8217;s service, best illustrates the magnitude of what this project entailed.\u00a0 \u00a0 \u00a0<em>Refer to the 1M:50S mark in Fastline&#8217;s promotional video, for a closeup of the automated logistics technology implemented.<\/em><\/p>\n<p><iframe loading=\"lazy\" title=\"Fastline International Promo Video\" width=\"720\" height=\"405\" src=\"https:\/\/www.youtube.com\/embed\/sjp8U7cOwZo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p style=\"text-align: justify;\">For information about Alchester&#8217;s Project Management and Business \/ IT Consulting services,<\/p>\n<p style=\"text-align: justify;\"><a href=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/05\/Abslogo3-.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"  wp-image-315 alignleft\" src=\"http:\/\/www.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/05\/Abslogo3--300x155.jpg\" alt=\"Abslogo3\" width=\"147\" height=\"76\" srcset=\"https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/05\/Abslogo3--300x155.jpg 300w, https:\/\/abswww.alchester.com.au\/solutions\/wp-content\/uploads\/2015\/05\/Abslogo3-.jpg 351w\" sizes=\"auto, (max-width: 147px) 100vw, 147px\" \/><\/a>p:\u00a0 03 97626293<br \/>\ne:\u00a0 <a href=\"mailto:tech@alchester.com.au\">tech@alchester.com.au<\/a><br \/>\nw: <a href=\"http:\/\/www.alchester.com.au\">www.alchester.com.au<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>During 2013 thru 2015, Fastline Logistics, again,\u00a0 expanded its 35 year\u00a0 logistics warehousing distribution business, this time,\u00a0 to deploy a fully automated KNAPP Multi-channel OSR &#8220;picking&#8221; system in a purpose built warehouse facility. The decision to undertake this as an internally controlled and managed solution\u00a0 was\u00a0 promoted and overseen by Alchester in the capacity of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,8],"tags":[],"class_list":["post-576","post","type-post","status-publish","format-standard","hentry","category-uncategorized","category-virtualisation"],"_links":{"self":[{"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=\/wp\/v2\/posts\/576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=576"}],"version-history":[{"count":40,"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=\/wp\/v2\/posts\/576\/revisions"}],"predecessor-version":[{"id":1613,"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=\/wp\/v2\/posts\/576\/revisions\/1613"}],"wp:attachment":[{"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abswww.alchester.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}